|
|
|
|
LEADER |
02507nmm a2200313 u 4500 |
001 |
EB001896111 |
003 |
EBX01000000000000001059117 |
005 |
00000000000000.0 |
007 |
cr||||||||||||||||||||| |
008 |
200506 ||| eng |
020 |
|
|
|a 9789811534287
|
245 |
0 |
0 |
|a Research on Hydropower Development and Delivery in Congo River
|h Elektronische Ressource
|
250 |
|
|
|a 1st ed. 2020
|
260 |
|
|
|a Singapore
|b Springer Nature Singapore
|c 2020, 2020
|
300 |
|
|
|a VIII, 129 p. 69 illus., 68 illus. in color
|b online resource
|
505 |
0 |
|
|a Hydropower Development Promotes Sustainable Development of Africa -- Hydropower Resources and Development Planning of the Congo River -- Exploitation Planning of Downstream Congo River Hydropower -- Consumption Market and Transmission Scheme of Congo River Hydropower -- Project Investment Estimation and Economic Analysis -- Comprehensive Benefits of Hydropower Development in the Congo River -- Financing Mechanisms and Support Measures -- Conclusions
|
653 |
|
|
|a Mechanical Power Engineering
|
653 |
|
|
|a Electric power production
|
653 |
|
|
|a Electrical Power Engineering
|
653 |
|
|
|a Energy policy
|
653 |
|
|
|a Energy Policy, Economics and Management
|
653 |
|
|
|a Energy and state
|
710 |
2 |
|
|a Glob. Ener. Interconn. Deve. &Coop. Org
|
041 |
0 |
7 |
|a eng
|2 ISO 639-2
|
989 |
|
|
|b Springer
|a Springer eBooks 2005-
|
028 |
5 |
0 |
|a 10.1007/978-981-15-3428-7
|
856 |
4 |
0 |
|u https://doi.org/10.1007/978-981-15-3428-7?nosfx=y
|x Verlag
|3 Volltext
|
082 |
0 |
|
|a 621.31
|
520 |
|
|
|a This book systematically discusses hydropower development on the Congo River. Accelerating the development of hydropower on the Congo will significantly enhance the interconnection of Africa’s cross-border, trans-regional and intercontinental power grids, ensure a clean, reliable and affordable electricity supply in Africa, and promote the electrification, industrialization, and integration of Africa. The book comprehensively assesses the hydropower resources and watershed characteristics of the Congo River, focuses on cascade hydropower development planning and design in the lower reaches of the Congo River, and analyzes the hydropower consumption market, transmission scheme, construction timing, investments and economy. Project investments, financing mechanisms and safeguard measures are also addressed. The plan presented here offers a vital resource for all those interested in hydropower development in the Congo River and sustainable development in Africa
|