|
|
|
|
LEADER |
01626nmm a2200253 u 4500 |
001 |
EB000997840 |
003 |
EBX01000000000000000791430 |
005 |
00000000000000.0 |
007 |
cr||||||||||||||||||||| |
008 |
150318 ||| eng |
100 |
1 |
|
|a Clarke, Charles
|
245 |
0 |
0 |
|a Observations on the intended tunnel beneath the river Thames
|h Elektronische Ressource
|b shewing the many defects in the present state of that projection
|c by Charles Clarke
|
246 |
3 |
1 |
|a Reports with plans and sections, &c. of the proposed dry tunnel, or passage from Gravesend in Kent, to Tilbury in Essex
|
260 |
|
|
|a London
|b Sold by Messrs Robinsons, and J. Taylor
|c 1799, 1799
|
300 |
|
|
|a 25 [i.e. 28] p., [2] leaves of plates
|b ill
|c 31 cm
|
538 |
|
|
|a Full text online
|
653 |
|
|
|a Tunnels / England / Thames River
|
700 |
1 |
|
|a Dodd, Ralph
|
041 |
0 |
7 |
|a eng
|2 ISO 639-2
|
989 |
|
|
|b ZDB-1-MME
|a Making of the Modern World
|
500 |
|
|
|a "1820 monthly expenditures": manuscript (1 leaf) laid in. - A reply to Reports with plans and sections, &c. of the proposed dry tunnel, or passage from Gravesend in Kent, to Tilbury in Essex, demonstrating its practicability and great importance to the two counties, and nation at large, &c. by R. Dodd, engineer.--P. [12]. - Errata at end of text. - Goldsmiths'-Kress no. 17739.1. - Includes bibliographical references. - OCLC, 20801851. - Page 28 misnumbered as 25. - Reproduction of original from Kress Library of Business and Economics, Harvard University
|
856 |
4 |
0 |
|u http://nl.sub.uni-goettingen.de/id/19010164900400?origin=/collection/nlh-mme
|x Verlag
|3 Volltext
|
082 |
0 |
|
|a 320
|
082 |
0 |
|
|a 330
|