Time-To-Build Interrelated Investment and Labour Demand Modelling With Applications to Six OECD Countries
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are indu...
Main Author: | |
---|---|
Format: | eBook |
Language: | English |
Published: |
Berlin, Heidelberg
Springer Berlin Heidelberg
1995, 1995
|
Edition: | 1st ed. 1995 |
Series: | Lecture Notes in Economics and Mathematical Systems
|
Subjects: | |
Online Access: | |
Collection: | Springer Book Archives -2004 - Collection details see MPG.ReNa |
Summary: | As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries |
---|---|
Physical Description: | IX, 204 p online resource |
ISBN: | 9783642468155 |