Plant design and operations
This book provides practical guidance on the design, operation, and maintenance of process facilities to managers, engineers, operators, and maintenance specialists. It is supported by useful, real-world examples and experience from a wide range of facilities and industries and includes guidance on...
Main Author: | |
---|---|
Format: | eBook |
Language: | English |
Published: |
Waltham, Massachusetts
GPP
2015
|
Series: | Engineering professional collection
|
Subjects: | |
Online Access: | |
Collection: | O'Reilly - Collection details see MPG.ReNa |
Table of Contents:
- Includes bibliographical references and index
- Heavy Sludge DepositsSpills and Overflows; Flame Propagation Through Drains; Catching Samples; Air-Blowing of Hydrocarbon Lines; Positive isolation; Level 1-Closed Valve; Control valves; Blowdown valves; Shutdown valves (offshore); Level 2-Closed Valve with Open Bleeder; Level 3-Double Block and Bleed; Level 4-Block and Bleed with Line Break; Level 5-Block, Bleed, and Spectacle Blind; Level 6-Double Block and Bleed with Blind; Level 7-Double Block and Bleed with Line Break; Lockout/tagout; Group Lockout; Lockboxes; Car Seals; Padlocks; Tags; Removing Locks and Tags; Electrical Isolation
- Storage and Handling of Flammable LiquidsRegulations and standards; Handling requirements; Nonprocess Operations; Outside Storage; Coal and Coke Storage; Drum Storage; Drainage; Fire Protection and Prevention; Cylinders; Loading Racks; Simultaneous Operations; Managing SIMOPs; SIMOPs Matrix; Conducting the SIMOPs; Kickoff meeting; Communication meetings; Closeout; Examples; Example 1-Facility Design; Example 2-Heat Exchanger; 2 Maintenance and inspection; Introduction; Types of maintenance; Repair Maintenance; Condition-Based Maintenance; Scheduled Maintenance
- Online cleaning and repairInspection; Regulations and Standards; Inspection Frequency; Inspection Records; Risk-Based Inspection; Analyze risk; Spare Parts; Determine costs; Allocate resources; 3 Energy control procedures; Introduction; Regulations and standards; OSHA 29 CFR 1910.119; OSHA 29 CFR 1910.146; API 2015; API 2026; API 2217A; ANSI Z117.1; Removal of the hazard; Equipment and piping; Venting and Draining Requirements; Manways; Electrical Equipment; Mechanical Equipment; Pipe Plugs; Minimizing contact with air; Limiting Oxygen Concentration; Blanketing; Tank Filling and Emptying
- Reliability-Centered MaintenanceMaintenance task organization; Step 1-Plan the Work; Step 2-Conduct a JHA; Step 3-Issue a Work Permit; Step 4-Shutdown and Isolate Equipment; Step 5-First Break; Step 6-Perform the Work; Step 7-Close Out the Work/Permit; Step 8-Handover to Operations; Readiness review; Mechanical completion; Physically complete and clean; Tight; Inspected, tested, and documented; Pressure tests; Maximum Allowable Working Pressure; Test Medium; Tightness Tests; Strength Tests; Testing Procedures; Hydrostatic (liquid); Pneumatic (gas); Installing blinds; Pressure Test Manual
- Front Cover; Plant Design and Operations; Copyright Page; Contents; 1 Operations; Introduction; Professional Advice; Regulations, Standards, and Guidance; Regulations; Industry Standards; ISO; ANSI; Guidance Documents; Units of Measurement; Risk Reduction; Risk Analysis; Quantification; Flammable and Combustible Materials; Flammable Range; Flammable Limits; Flash Point; Combustible Liquids; Class II liquids; Class III liquids; Flammable Liquids; Ignition Sources; Area Classification; Housekeeping; General Neatness; Proper Placement; Grass and Brush; Equipment and Piping