Plant design and operations

This book provides practical guidance on the design, operation, and maintenance of process facilities to managers, engineers, operators, and maintenance specialists. It is supported by useful, real-world examples and experience from a wide range of facilities and industries and includes guidance on...

Full description

Bibliographic Details
Main Author: Sutton, Ian
Format: eBook
Language:English
Published: Waltham, Massachusetts GPP 2015
Series:Engineering professional collection
Subjects:
Online Access:
Collection: O'Reilly - Collection details see MPG.ReNa
LEADER 05064nmm a2200433 u 4500
001 EB001939226
003 EBX01000000000000001102128
005 00000000000000.0
007 cr|||||||||||||||||||||
008 210123 ||| eng
020 |a 9780323311472 
050 4 |a TP155.5 
100 1 |a Sutton, Ian 
245 0 0 |a Plant design and operations  |c Ian Sutton 
260 |a Waltham, Massachusetts  |b GPP  |c 2015 
300 |a 409 pages  |b illustrations (some color) 
505 0 |a Includes bibliographical references and index 
505 0 |a Heavy Sludge DepositsSpills and Overflows; Flame Propagation Through Drains; Catching Samples; Air-Blowing of Hydrocarbon Lines; Positive isolation; Level 1-Closed Valve; Control valves; Blowdown valves; Shutdown valves (offshore); Level 2-Closed Valve with Open Bleeder; Level 3-Double Block and Bleed; Level 4-Block and Bleed with Line Break; Level 5-Block, Bleed, and Spectacle Blind; Level 6-Double Block and Bleed with Blind; Level 7-Double Block and Bleed with Line Break; Lockout/tagout; Group Lockout; Lockboxes; Car Seals; Padlocks; Tags; Removing Locks and Tags; Electrical Isolation 
505 0 |a Storage and Handling of Flammable LiquidsRegulations and standards; Handling requirements; Nonprocess Operations; Outside Storage; Coal and Coke Storage; Drum Storage; Drainage; Fire Protection and Prevention; Cylinders; Loading Racks; Simultaneous Operations; Managing SIMOPs; SIMOPs Matrix; Conducting the SIMOPs; Kickoff meeting; Communication meetings; Closeout; Examples; Example 1-Facility Design; Example 2-Heat Exchanger; 2 Maintenance and inspection; Introduction; Types of maintenance; Repair Maintenance; Condition-Based Maintenance; Scheduled Maintenance 
505 0 |a Online cleaning and repairInspection; Regulations and Standards; Inspection Frequency; Inspection Records; Risk-Based Inspection; Analyze risk; Spare Parts; Determine costs; Allocate resources; 3 Energy control procedures; Introduction; Regulations and standards; OSHA 29 CFR 1910.119; OSHA 29 CFR 1910.146; API 2015; API 2026; API 2217A; ANSI Z117.1; Removal of the hazard; Equipment and piping; Venting and Draining Requirements; Manways; Electrical Equipment; Mechanical Equipment; Pipe Plugs; Minimizing contact with air; Limiting Oxygen Concentration; Blanketing; Tank Filling and Emptying 
505 0 |a Reliability-Centered MaintenanceMaintenance task organization; Step 1-Plan the Work; Step 2-Conduct a JHA; Step 3-Issue a Work Permit; Step 4-Shutdown and Isolate Equipment; Step 5-First Break; Step 6-Perform the Work; Step 7-Close Out the Work/Permit; Step 8-Handover to Operations; Readiness review; Mechanical completion; Physically complete and clean; Tight; Inspected, tested, and documented; Pressure tests; Maximum Allowable Working Pressure; Test Medium; Tightness Tests; Strength Tests; Testing Procedures; Hydrostatic (liquid); Pneumatic (gas); Installing blinds; Pressure Test Manual 
505 0 |a Front Cover; Plant Design and Operations; Copyright Page; Contents; 1 Operations; Introduction; Professional Advice; Regulations, Standards, and Guidance; Regulations; Industry Standards; ISO; ANSI; Guidance Documents; Units of Measurement; Risk Reduction; Risk Analysis; Quantification; Flammable and Combustible Materials; Flammable Range; Flammable Limits; Flash Point; Combustible Liquids; Class II liquids; Class III liquids; Flammable Liquids; Ignition Sources; Area Classification; Housekeeping; General Neatness; Proper Placement; Grass and Brush; Equipment and Piping 
653 |a Chemical plants / Design and construction / fast 
653 |a SCIENCE / Chemistry / Industrial & Technical / bisacsh 
653 |a TECHNOLOGY & ENGINEERING / Chemical & Biochemical / bisacsh 
653 |a Chemical plants / Design and construction / http://id.loc.gov/authorities/subjects/sh85022932 
041 0 7 |a eng  |2 ISO 639-2 
989 |b OREILLY  |a O'Reilly 
490 0 |a Engineering professional collection 
776 |z 9780323311472 
776 |z 0323299644 
776 |z 0323311474 
776 |z 9780323299640 
856 4 0 |u https://learning.oreilly.com/library/view/~/9780323299640/?ar  |x Verlag  |3 Volltext 
082 0 |a 500 
082 0 |a 620 
082 0 |a 745.4 
082 0 |a 660 
520 |a This book provides practical guidance on the design, operation, and maintenance of process facilities to managers, engineers, operators, and maintenance specialists. It is supported by useful, real-world examples and experience from a wide range of facilities and industries and includes guidance on occupational health and safety, industrial hygiene and personal protective equipment. Topics covered include: energy control; safety in design; security, equipment, and transportation. A logical, practical guide to maintenance task organization is provided, from conducting a job hazards analysis to the issue of a work permit, and to the shutdown and isolation of equipment. Common hazards are covered in detail, including flow problems, high pressure, corrosion, power failure, and many more. --