Lot-Sizing and Scheduling for Flexible Flow Lines

Bibliographic Details
Main Author: Quadt, Daniel
Format: eBook
Language:English
Published: Berlin, Heidelberg Springer Berlin Heidelberg 2004, 2004
Edition:1st ed. 2004
Series:Lecture Notes in Economics and Mathematical Systems
Subjects:
Online Access:
Collection: Springer Book Archives -2004 - Collection details see MPG.ReNa
LEADER 02660nmm a2200325 u 4500
001 EB000660069
003 EBX01000000000000000513151
005 00000000000000.0
007 cr|||||||||||||||||||||
008 140122 ||| eng
020 |a 9783642171017 
100 1 |a Quadt, Daniel 
245 0 0 |a Lot-Sizing and Scheduling for Flexible Flow Lines  |h Elektronische Ressource  |c by Daniel Quadt 
250 |a 1st ed. 2004 
260 |a Berlin, Heidelberg  |b Springer Berlin Heidelberg  |c 2004, 2004 
300 |a XVIII, 227 p. 42 illus  |b online resource 
505 0 |a 1 Introduction -- 1.1 Lot-Sizing and Scheduling -- 1.2 Flexible Flow Lines -- 1.3 Characteristics of the Problem -- 1.4 Scope and Outline of the Study -- 2 Lack of Solution Procedures in the Literature -- 2.1 Lot-Sizing Problems -- 2.2 Scheduling Problems -- 2.2.1 Branch & Bound Procedures -- 2.2.2 Local Search and Metaheuristics -- 2.2.3 Stage Decomposition Approaches -- 2.2.4 Job-Oriented Procedures -- 2.2.5 (Sequential) Loading and Sequencing Algorithms -- 2.3 Summary and Conclusion -- 3 An Integrative Solution Approach -- 4 Phase I: Bottleneck Planning -- 4.1 Lot-sizing and Scheduling on Parallel Machines -- 4.2 Literature Review -- 4.3 Standard Models with Extensions -- 4.4 Solution Approach -- 4.5 Computational Results -- 4.6 Summary -- 5 Phase II: Schedule Roll-Out -- 5.1 Premises and Scope -- 5.2 Scheduling Non-Bottleneck Production Stages -- 5.3 Two Remarks on the Resulting Schedule -- 5.4 Summary -- 6 Phase III: Product-to-Slot Assignment -- 6.1 Goal Trade-Off -- 6.2 Genetic Algorithms -- 6.3 Solution Procedure: Two Nested Genetic Algorithms -- 6.4 Computational Results -- 6.5 Summary -- 7 An Illustrative Example -- 7.1 Data of the Example -- 7.2 Solution after Phase I -- 7.3 Solution after Phase II -- 7.4 Solution after Phase III -- 8 An Application in the Semiconductor Industry -- 8.1 Semiconductor Process Flow -- 8.2 Problem Specifics and Dimensions -- 8.3 Modeling Assumptions -- 8.4 Short-Term Production Planning -- 8.5 Medium-Term Capacity Planning -- 9 Summary and Conclusions -- List of Abbreviations -- List of Symbols -- References 
653 |a Operations Management 
653 |a Operations research 
653 |a Production management 
653 |a Operations Research/Decision Theory 
653 |a Planning 
653 |a Organization 
653 |a Decision making 
653 |a Organization 
041 0 7 |a eng  |2 ISO 639-2 
989 |b SBA  |a Springer Book Archives -2004 
490 0 |a Lecture Notes in Economics and Mathematical Systems 
856 4 0 |u https://doi.org/10.1007/978-3-642-17101-7?nosfx=y  |x Verlag  |3 Volltext 
082 0 |a 658.5